The Installed Systems Engineering Memo™ — the asset owner's documented engineering record of the system's condition at the time of assessment.
The Installed Systems Engineering Review™ is a structured, engineering-led evaluation of an installed permanent access, fall-protection, or rescue system on a built asset. It is independent of any supplier, installer, service provider, or party with commercial interest in the Review’s conclusion.
The Review evaluates the system as it actually exists at the time of the Review:
01
02
03
04
01
02
03
04
05
06
Many of these conditions trace to an acceptance that no independent party recorded — where the boundary between accepted and open was never documented, and the ambiguity was inherited along with the asset.
The Review engagement begins through the Engage RSE intake process. Typical engagement duration is 8–12 weeks for a single-asset Review on a conventional commercial building, scaling proportionally for multi-asset or portfolio engagements.
01
02
03
04
05
06
07
08
09
The Installed Systems Engineering Review™ is the engineering record the asset owner does not yet have but is in a different position with than without.
Where the question is the owner’s documents rather than the installed system, the Service Agreement & Records Review precedes the Review.