BMU Beneficial Use and Construction Use: Separating Interim Use from Acceptance

By Uwe Janssen · Rauch Safety & Engineering · Las Vegas, Nevada Two kinds of interim use arise in the period between a building maintenance unit’s testing and its normal service life. Beneficial use is the operation of the system before acceptance is complete — potentially while findings from factory or site acceptance testing remain […]

Suspended Access Accidents: What an Engineering Investigation Examines

By Uwe Janssen · Rauch Safety & Engineering · Las Vegas, Nevada An engineering investigation of a suspended access accident — a building maintenance unit, a suspended platform, a fall-protection or rope descent system — examines how the event came to be, and its examination can extend across the asset’s lifecycle rather than stopping at […]

Façade Access Design: The Decisions That Must Be Made Early

By Uwe Janssen · Rauch Safety & Engineering · Las Vegas, Nevada A small set of façade access decisions must be made early in design — in concept and schematic, while massing, structure, and façade geometry are still fluid — because they are decisions the rest of the project progressively locks in place. They are: […]

Common Failure Modes in Building Maintenance Units: A Field Engineer’s Perspective

By Uwe Janssen · Rauch Safety & Engineering · Las Vegas, Nevada Building maintenance units fail in recognizable ways. Across the systems I have examined and tested, the conditions that produce failures cluster into a small taxonomy: the drivetrain and hoisting machinery; the wire rope and the components that guide it; the interface between the […]

Translate »