Technical articles on building maintenance units, façade access, and fall-protection engineering — inspection, failure modes, acceptance testing, design, investigation, procurement, and retrofit.
01
BMU Inspection and Certification: Who Is Responsible
Who is responsible for BMU inspection and certification, what OSHA 1910.66 and ASME A120.1 actually require, and what the annual certificate does not tell the building owner.
Common Failure Modes in Building Maintenance Units
How building maintenance units fail: the recurring failure categories in BMU drivetrains, wire rope, structural interfaces, and safety devices, from a field engineer’s perspective.
BMU Factory & Site Acceptance Testing: What FAT and SAT Verify
What a factory acceptance test (FAT) and site acceptance test (SAT) verify on a building maintenance unit, what each does not verify, and what an owner should hold from both.
Façade Access Design: The Decisions That Must Be Made Early
Which façade access and fall-protection decisions must be made in early design — geometry, structural provisions, rescue feasibility — and why they harden as the project advances.
Suspended Access Accidents: What an Engineering Investigation Examines
What an engineering investigation of a suspended access or BMU accident examines — design geometry, acceptance records, inspection scope, configuration — and how it informs standard-of-care questions.
Buying a BMU from an Overseas Manufacturer: What Protects the Owner
Buying a building maintenance unit from an overseas manufacturer: the distance, delivery-chain, documentation, and payment-structure questions that protect the owner between order and acceptance.
BMU Beneficial Use and Construction Use: Separating Interim Use from Acceptance
Beneficial use before acceptance is complete and construction use after SAT: separating interim use from acceptance, the records each custody transition needs, and what the evidence can establish about early-service conditions.
Retrofitting and Replacing Permanent Access Systems: The Second Installation Is the One the Owner Runs
Retrofit or replace an aging BMU or permanent access system: why the engineering case comes before procurement, the five drivers of the decision, owner-direct procurement, and the acceptance record the retrofit should leave behind.